Gas Piping And Gas Piping Replacement Laporte, Indiana
Technician Invoice Notes: Performed Work Outlined In Previous Estimate. Rerouted Gas Pipe From Below Floor Joist To Inside Joist Space Supplying Stove. Re-pressurized And Performed Leak Search With No Leaks. Relit All Gas Appliances With No Issues.
LAPORTE, IN
05-11-2022
Gas Piping And Gas Piping Replacement Laporte, Indiana
Remove And Dispose Of Existing Gas Piping Extending From The Meter Locations To The Following Appliances:
One Gas Water Boiler
One Gas Water Heater
Two Gas Fire Places
One Gas Furnace
Provide And Install PVC Sleeves Through The Foundation To Protect The New Gas Piping From The Concrete Foundation.
Provide And Install New Black Iron Gas Piping To The Appliances Above With The Exception Of The Second Floor Fireplace. A New 1/2
LaPorte, IN
01-28-2022
Gas Piping And Gas Piping Replacement Laporte, Indiana
Technician Invoice Notes: Installed New 1/2” Gas Piping In Basement. Pressurized And Inspected.
LaPorte, IN
11-08-2021
Gas Piping And Gas Piping Replacement Laporte, Indiana
Technician Invoice Notes: Completed Work Outlined In Estimate. Installed New Gas Piping To Accommodate New Gas Fireplace Including New Key Valve Outside Of Proposed Location Of New Fire Place And 1/4 Turn Gas Cock At Fireplace Location. Pressurized System And Leak Searched Piping. Relit Water Heater And Checked Other Appliances.
LAPORTE, IN
10-22-2021
Gas Piping And Gas Piping Replacement Laporte, Indiana
Technician Invoice Notes: Upon Arrival Quoted For Installation Of Approximately 4’ Of 1/2” Threaded Gas Piping Stubbing Up Inside Of Cabinetry That Will Supply Current Stove And New Stove When Ordered. Client Accepted. Ran 4’ Of 1/2” Threaded Gas Piping Stubbing Up Inside Of Kitchen Cabinetry Directly Next To Stove. Provided One New Gas Cock In Cabinetry. Tested Operation Of Installation By Cycling Stove Top And Spraying All New Joints To Test For Gas Leaks. No Issues At This Time.
Laporte, IN
10-22-2021
Gas Piping And Gas Piping Replacement Laporte, Indiana
Invoice Notes: Upon Arrival Found Aged Gas Cock Supplying New Stove. Replaced With New 3/4” Gas Cock And Necessary Fittings. Re Attached Onto New 3/4” Gas Whip . Re Pressurized And Sprayed New Joints With Leak Detector. No Leaks Or Issues At This Time.
LAPORTE, IN
07-02-2021
Gas Piping And Gas Piping Replacement Laporte, Indiana
Technician Invoice Notes: Removed Pressure Test Gauge. Connected Flexible Gas Supply To Fireplace. Isolated Gas At Gas Cock In Utility Room.
LaPorte, IN
02-23-2021
Gas Piping And Gas Piping Replacement Laporte, Indiana
Technician Invoice Notes: Upon Arrival Client Identified Three Locations Discovered By Nipsco To Have Slow Leaks On Gas Piping. Repaired One Location By Disassembly And Cleaning, Resealed With Thread Sealant. Two Locations Required Installation Of Unions And Re Threading On A Pipe. Assembled With New Sealant And Pressurized Tested Repair With Micro Leak Detection Solution.
LAPORTE, IN
01-15-2021
Gas Piping And Gas Piping Replacement Laporte, Indiana
Provide And Install New 1/2 Black Iron Gas Piping Extending From An Existing 1/2 Valve On Thee Basement Ceiling To The New Fireplace Location In The Basement.
Provide And Install One New 1/2 Inch Ball Valve In The Mechanical Room Behind The Fireplace For Easy Reach Access.
Provide And Install A New Keyed Stop Valve Near The Front Of The Fireplace Per Code Requirements.
Final Connection To The Gas Fireplace Appliance Shall Be Provided By Other.
LaPorte, IN
12-10-2020
Gas Piping And Gas Piping Replacement Laporte, Indiana
Technician Invoice Notes: Replaced Gas Cock Serving Kitchen Stove. Replaced Two Stops Under Kitchen Sink On Hot Side. Removed Toilet For Disposal.
LaPorte, IN
09-28-2020
Gas Piping And Gas Piping Replacement Laporte, Indiana
Technician Invoice Notes: Pressurized System And Checked Gas Piping For Leaks On Accessible Piping. Found Four Locations On Existing Piping Failed Pressurizing Test. Unable To Inspect Piping In Walls. Recommend Replacement Of Entire Gas Piping To Eliminate Numerous Leaks In Smaller Piping System.
LaPorte, IN
09-18-2020
Gas Piping And Gas Piping Replacement Laporte, Indiana
Technician Invoice Notes: Call To Pressure Test Gas Line To Pool Heater And Connect Pool Heater Piping. Pressure Tested Gas Piping To 5 PSIG. Re-connected Gas Piping To Pool Heater And Re-lit Gas Appliances. Tested Piping For Leaks And Observed Pool Heater Operation.
LaPorte, IN
07-30-2020
Gas Piping And Gas Piping Replacement Laporte, Indiana
Technician Invoice Notes: Installed New 1” Blk Tee In Main Gas Line In Basement. Installed New 1” Gas Piping To Outdoors At Specified Location For Future Use. Capped Line And Pressurized. Leak Tested Fittings. Relocated Hose New Faucet To The Right Of Previous Location To Accommodate New Gas Meter. Pressurized And Inspected.
LaPorte, IN
06-22-2020
Gas Piping And Gas Piping Replacement Laporte, Indiana
Technician Invoice Notes: Investigated Gas Smell. Leak Tested All Gas Piping Near Location Of Odor. Found Leak On 3/4” Union. Tightened Union And Re Inspected. Found No Other Leaks At This Time In Area.
LaPorte, IN
06-03-2020
Gas Piping And Gas Piping Replacement Laporte, Indiana
Technician Invoice Notes: Upon Arrival Found Moisture At Base Of Wall In Kitchen Behind Refrigerator. Camera Inspected Through Small Hole But Unable To Locate Source. Camera Inspected Through Shower Valve Hole In Second Floor Bath And In Joist Space Under Shower. Unable To Locate Source. Removed Sections Of Drywall Behind Refrigerator To Identify Location Of Leak. Due To A False Ceiling Unable To Make Repairs From Kitchen Side. Removed Section Of Wall In Shower Alcove On Opposite Side Of Wall To Expose 3/4” Copper Piping Failure Location. Removed Leaking Copper Tee And Surrounding Piping. Replaced With New Copper Piping And Fittings.
LaPorte, IN
04-11-2020
Gas Piping And Gas Piping Replacement Laporte, Indiana
Technician Invoice Notes: Call For No Heat. Upon Arrival Found Thermostat Calling For Heat With No Low Voltage. After Further Investigation Found Failed Transformer. Client Had Switched To A/C On The Thermostat Recently And The Furnace Never Came Back On. Found Rodent Chewed Wired At Outdoor Condenser. Repaired Low Voltage Wiring And Re-sealed Line Set Hole. Inspected Furnace Heat Exchanger And Found The Primary Cells Failed. Performed A Carbon Monoxide Test And Unit Is Emitting No Carbon Monoxide At This Time. Highly Recommended Client To Replace Furnace Due To The Potential For Carbon Monoxide Gases.
LaPorte, IN
04-11-2020
Gas Piping And Gas Piping Replacement Laporte, Indiana
Technician Invoice Notes: Investigated And Found Basement Toilet To Have A Broken Fill Valve. Replaced Toilet Tank Components. Set Proper Water Level And Cycled To Test Operation.
LaPorte, IN
04-10-2020
Gas Piping And Gas Piping Replacement Laporte, Indiana
Technician Invoice Notes: Call For Main Circulator Pump Leaking. Upon Arrival Found Failed Bearing Assembly In Main B&G Pump. Replaced Pump Assembly With New Taco Circulator And Cycled Boiler To Ensure Proper Operation. System Is Heating Properly At This Time. Recommend Having The Other Two Circulator Pumps Replaced Due To Noisy Operation And Having Boiler Serviced Annually For Preventative Maintenance Purposes.
LaPorte, IN
04-10-2020
Gas Piping And Gas Piping Replacement Laporte, Indiana
Technician Invoice Notes: Upon Arrival Hooked Up Customer Stove And Tested For Proper Operation And Gas Leaks. No Gas Leaks And Proper Operation Of Stove At This Time.
LaPorte, IN
04-09-2020
Gas Piping And Gas Piping Replacement Laporte, Indiana
INSTALLED NEW WATER SUPPLY, DRAINAGE PIPING, GAS PIPING AND DRYER VENT TO MOVE WASHER AND DRYER UPSTAIRS FROM BASEMENT.
LaPorte, IN
03-28-2020
Gas Piping And Gas Piping Replacement Laporte, Indiana
Upon Arrival Found Kitchen Sink With Standing Water In Drain. Augered Kitchen Sink Drain. Reassembled Trap Way And Ran Large Amount Of Water To Flush Line And Test Operation. Observed Proper Flow.
LAPORTE, IN
03-23-2020
Gas Piping And Gas Piping Replacement Laporte, Indiana
Located Underground Sewer Piping Near House Outdoors. Excavated Area And Unearthed Pipe. Found Cast Iron Separation Near Foundation. Removed Section Of Disjointed Piping To Area With Proper Pitch. Installed New 4” Pvc Piping And Clean Out. Flushed Toilet And Ran Water In Fixtures. Observed Proper Flow Through Repaired Piping. Backfilled Site And Bedded Piping.
Laporte, IN
03-23-2020
Gas Piping And Gas Piping Replacement Laporte, Indiana
Performed Water Heater Flush And Cleaned Combustion Components. Install One New Full Port Brass Ball Valve For Future Maintenance.
LaPorte, IN
03-17-2020